Curtis-Teixeiro Biomass Plant (A Coruña, Galicia, Spain)

Portada-Sep_Curtis-Texeiro_-FuturEnergy_Julio19

The Curtis-Teixeiro biomass plant is one the most important renewable energy projects in Europe. Greenalia will invest €135 million in the plant and the construction work is being carried out by a joint venture made up of Acciona Industrial and Imasa Ingeniería y Proyectos. Under the terms of the EPC contract, the consortium will be responsible for the O&M of the plant over a period of 15 years. The Curtis Teixeiro biomass plant is being built on a 103,000 m2 site and will have a capacity of 50 MW when fully operational, enough energy to supply a population of over 250,000. Once completed, this pioneer in terms of technological innovation will be the largest forest biomass facility in the Iberian Peninsula and Southern Europe, using pruning and eucalyptus wood waste.

Once commissioned, the plant will generate 324 GWh per annum and will have the capacity to treat 500,000 tonnes of forest biomass. This waste will be supplied by group subsidiary Greenalia Forest, which will collect it from FSC or PEFC certified forests within a radius of 100 km from the plant.

The plant features the latest biomass power generation technologies and complies with the most stringent European legislation. This is a highly efficient power generation facility, with low CO2 emissions. It uses dry cooling technology, which means minimal water consumption and no effluent discharges. Construction work is scheduled for completion in September and the plant is expected to come online in the first quarter of 2020.

DOWNLOAD COMPLETE REPORT