Germany set to have 635 bcf new-build LNG regasification capacity, contributing 31% of Europe’s capacity growth by 2023

0 0
Planta regasificadora El Musel. Foto cortesía de Enagas / El Musel regasification plant. Photo courtesy of: Enagas

Germany is expected to drive capacity growth in Europe’s liquefied natural gas (LNG) regasification industry from planned and announced (new-build) projects during the outlook period 2019 to 2023, contributing around 31% of Europe’s total growth, according to GlobalData.

The company’s report,‘LNG Regasification Industry Outlook in Europe to 2023 – Capacity and Capital Expenditure Outlook with Details of All Operating and Planned Regasification Terminals’, reveals that Germany is expected to have new-build regasification capacity of 635 billion cubic feet (bcf) by 2023.

Wilhelmshaven Floating and Brunsbuttel are the two upcoming announced regasification terminals in Germany during the 2019 to 2023 period. Both the terminals are expected to start their operations in 2022, with the Wilhelmshaven Floating terminal expected to add the highest regasification capacity of 353bcf by 2023.

Following Germany, GlobalData identifies Spain as the second highest country in terms of regasification capacity growth in Europe adding a new-build regasification capacity of 339bcf by 2023. Spain’s El Musel terminal is expected to have the highest capacity among planned and announced terminals with 247bcf of capacity by 2023.

Croatia has no active regasification terminals currently. The country is expected to add all of its new-build capacity growth from two planned regasification terminals, Croatia Floating and Hrvatska by 2023. Of these, the Hrvatska terminal is expected to have the highest regasification capacity of 211.8bcf by 2023.

Source: GlobalData